TOYOTA PROJECT
Uplift of 500k sq. ft. parts distribution center. Project was completed in 15-phase over a three years duration. Phasing was necessary to minimize impact on day to day operations. Services consisted of installation of 480 volt 2-section panel board, (5) 84” BAF Fans, (900) 6 & 4 lamp high bay fluorescent fixtures, (1200) strip fixtures. Provide power to charging equipment, workstations, parts lifts and (11) IDF cabinets. Installed Cat5E for (250) access points and (50) PC’s. Installed fiber backbone to (11) IDF cabinets.